Lagos Uses Concrete Pavement For 18km Eleko Epe Junction

ONGOING Massive Construction of the 6-lane rigid pavement on Eleko Epe T junction by Messers Craneburg Construction.

Governor of Lagos State, Mr Babajide Sanwo-Olu flagged off the construction on 1st November 2020.

ForAGreaterLagos

SanwoReports

Project Details:

  • The Total Length of the road from Eleko Junction to Epe T junction is 18.75km.
  • CONTRACTOR: Craneburg Construction
  • Provision of reinforced concrete drains, Culverts and Median Barrier
  • Installation of Traffic Lights
  • Landscaping of Road Verges
  • Preservation of rail line corridor with 50m RoW
  • Installation of Street Lights
  • Dedicated Truck Lane and Railway Line (for future).
  • Road to serve as template for construction of road leading towards the Dangote Refinery, Lekki Ports and the Lagos Free Zones.

Follow NekxMusic On: Twitter | Instagram | Facebook

Be the first to comment

Leave a Reply